Hi,
I've been reading many articls about SEP client upgrades and the number of different methods. I have not come across any article explaining the best method of deploying client upgrades to remote sites (meaning sites in another country, e.g. France, Spain)
I've already created client installation packages for my remote sites and attempted to deploy the upgrade. However, due to the slow WAN / MPLS links many clients have complaning of slow performance to the extent I had to stop the upgrade process and prevent any more clients being upgraded.
I'm upgrading my clients from a mixture of 11.0.7101.1056 and 11.0.6300.803 to 12.1.2015.2015
In order to successfully upgraded my clients and, at the same time, preserve their system performance over this slow link what cause of action would I need to take? Can I still use SEPM and simply create an upgrade schedule to suit?
I have tried using GPO's to deploy client upgrades and had some success but would like clarification of the best upgrade method over a slow WAN link.
Regards and Thank you